Industry : Oil and Gas
Client : Sharja
Challenge : Mechanical-Thermal and contact analysis of Flange and Blind flange assembly according to ASME code.
4 Images
Solution : Design and analysis of flange and Blind flange assembly Air cooled heat exchanger for estimation of temperature distribution, stress and displacement and behavior of bolts according to ASME Code.
Result : The Blind Flange assembly was declared safe under the given loading conditions. The project was well executed and requirements of the customer were met within the given time.
Industry : Oil and Gas
Client : Leading Heat Exchanger manufacturing industry,UK.
Challenge : Design optimization and analysis of shell cover according to ASME code.
Solution : Design optimization and analysis of shell cover of hair pin heat exchanger for estimation of temperature distribution, stress and displacement according to ASME Code.
Result : Design optimization and analysis of shell cover was well executed and requirements of the customer were met within the given time.
Industry : Oil and Gas
Client : Dubai
Challenge : Finite element analysis of over Nozzle according to ASME code.
Solution :Design and analysis of over Nozzle assembly was performed for the estimation stress and displacement according to ASME Code.
Result : The provided thickness of the material was not satisfying the reinforcement requirement, we had suggested the optimum thickness.
Industry : Oil and Gas
Client : Dubai
Challenge : Finite element analysis of over head condenser according to ASME code.
Solution :Design and analysis of over head condenser was performed for the estimation of temperature distribution, stress and displacement according to ASME Code.
Result : The project was well executed and requirements of the customer were met within the given time.
Industry : Automotive
Client : USA
Challenge : Thermal simulation of Heat sink using CFD analysis.
Solution :The work involved thermal simulation of Heat Sink size as-is and have longer run time until set point is reached at thermistor and design of heat sink to keep same run time as base line design using CFD analysis.
Result : The project was well executed and requirements of the customer were met within the given time.